Upper Hours: 7,700
Lower Hours: 2,500
Mileage: 14,062 KM
capacity: 100 Ton
Engine: Liebherr
Spec:
Double lattice-type swing-away jib, 35' - 62'
Hydraulic offset for the swing-away jib
Rooster Sheave
Second hoist mechanism
Hookblock 110,000, 3 sheaves, double hook
Hookblock 48,400 lbs, 1 sheave, single hook
Crane hook 16,500 lbs
Second boom head top sheave
Tyres 445/95 R 25 (16.00 R 25) - Michelin
Engine-independent heater incl. Timer - carrier cabin
Rim for tyre size 445/95 R 25 (16.00 R 25)
VarioBase - Variable supporting base (includes item 387 and 388)
12 V-socket in carrier cabin
Calix engine-preheating for carrier, including 230 V / 110 V connection
Battery charger including 230 V / 110 V connection
Additional counterweight 24,200 lbs (for a total counterweight of 62,040 lbs)
Additional engine-independent heating in superstructure cabin incl. timer
Second hoist limit switch
Two working floodlights at pivot section electrically adjustable
Flight warning light (recommended with battery charger position 560)
12 V-socket in crane cabin
Calix-engine preheating for superstructure including 230 V / 110 V connection
Preparation for dolly
Hydraulic oil preheating valve
8 ft (2440 mm) axle distance between axle 2 and 3
Programming of crane of boom extension from LTM 1100-4.2