CRANE CONFIGURATION
CRANE CARRIER
CRANE SUPERSTRUCTURE
Engine exhaust emission level V according to regulation EU 2016/1628
- Basic machine
Working equipment:
- Programming of the LICCON for subsequent retrofitting of the telescoping boom extension
- Programming of the LICCON for subsequent retrofitting of the swing-away jib
- Special swing-away jib (K) 2,9 m
- Second hoist
- Second boom head top sheave
- Second hoist limit switch
- Hook block 59,1t with 3 sheaves with double hook
- Hook block 26,1t with 1 sheave with single hook
- Load hook 8,8t
Additional equipment - Carrier:
- Crawler plates 900 mm, flat base plates
Additional equipment – Superstructure:
- Additional counterweight 6t (for total counterweight 32t)
- Lighting package upper carriage: two working headlights at pivot section (electrically adjustable) and headlights at the revolving stage (2x lateral and 2x at the rear)
- Flight warning light switchable between continuous light and flash light
- Additional engine-independent heating in crane cabin incl. Timer
- Monitoring of the winches and reverse camera with color display
- Remote control
- Installation for jump starting incl. cable - upper carriage
- 12V socket in crane cabin
Operating hours: approx. 850 h (06.2021)
(In the meantime the crane get labeled.)