CRANE CONFIGURATION
Crane carrier:
Engine exhaust emission level IV according to 97/68 EG and level Tier 4-final according to EPA/CARB
crane superstructure:
- Basic machine
Working equipment:
- Hook block 22.4 to with 3 sheaves with double hook
Additional equipment - Carrier:
- Tires 445/95 R 25 (16.00 R 25)
- Engine independent heater incl. Timer – carrier cabin
- Trailer coupling D-factor 19 with ALS-socket
- Storage box at the rear
- Storage box for support timber
- Support base registration
- Air-conditioned carrier seat (incl. seat heating)
Additional equipment – Superstructure:
- Hydraulic ballast device
- 5 to additional counterweight (2 parts) - Only in connection with hydraulic ballast device.
- Oil cooler
- Workspace boundary
- Remote diagnosis with GSM-module
- 3rd rotating beacon
- Two working floodlights at pivot section electrically adjustable
- Air-conditioned operators seat (incl. seat heating)
- LICCON data logger with evaluation software – Liftanalyser
- LICCON – work planner
Operating hours revolving structure: 1367 h (07.2021)
Operating hours undercarriage: 933 h (07.2021)
(In the meantime the crane get labeled.)