CRANE CONFIGURATION
CRANE CARRIER
Engine exhaust emission level IV according to 97/68 EG and level Tier 4-final according to EPA/CARB
CRANE SUPERSTRUCTURE
- Basic machine
Working equipment:
- Mounting support for single jib incl. programming
- Hook block 22.4 t with 3 sheaves with single hook
Additional equipment - Carrier:
- Tyres 445/95 R 25 (16.00 R 25)
- Engine independent heater incl. Timer – carrier cabin
- Trailer coupling D-factor 19 with ALS-socket
- Storage box on crane rear (not in connection with spare wheel holder)
- Storage box for support timber
- Support base registration
- Air condition in carrier cabin
Additional equipment - Superstructure
- Hydraulic ballast device
- 5 t additional counterweight (4 parts). Only in connection with hydraulic ballast device.
- Air condition in the crane cabin
- Workspace boundary
- Remote diagnosis with GSM-module
- Two working floodlights at pivot section, electrically adjustable
- Emergency operation of the crane hydraulic
- LICCON data logger with evaluation software – Liftanalyser
- LICCON – work planner
Operating hours revolving structure: 3979 h (08.2021)
Operating hours undercarriage: 3725 h (08.2021)
(In the meantime the crane get labeled).